Foreman |
- 1 Hr
- Passed 25 MCQ on trade Syllabus
|
- 4 Hrs Installation
- Candidates are required to install fibrous plaster board ceiling with concealed ceiling system within a 2350×2350 test bay, complete with a bulkhead/downlight recess, downlight openings, access panel, and partially plastered at joints;
- Candidates are allowed to help each other during transfer of levels and installation of fibrous plaster boards during the 1st 3 hours of the project;
- Candidates should be able to complete the installation in safe working manner, and complying to correct orientation & method of construction, levels, dimensions, tolerances, application of screws/rivets, neat plastering to joints, neatly cut downlight openings, etc.;
- Project to be completed within 4 hrs.
- candidate will fail the entire test if any hanger, wall angle, main or cross tee, boards drop during inspection;
|